Phase 9

Phase 9

Phase 9 started 25/02/20 which involves a remodelled University gateway ‘hub’ with landscaping on Hollingside Lane/South Road junction. Works in this phase involve:

  • New signalised pedestrian crossing on South Road between the new ‘hub’ and the woodland area to the North East of Elvet Hill/Trevelyan car park.
  • The removal of the existing signalised pedestrian crossing on South Road between Hollingside Lane and Elvet Hill Road.