Phase 9
Phase 9
Phase 9 started 25/02/20 which involves a remodelled University gateway ‘hub’ with landscaping on Hollingside Lane/South Road junction. Works in this phase involve:
- New signalised pedestrian crossing on South Road between the new ‘hub’ and the woodland area to the North East of Elvet Hill/Trevelyan car park.
- The removal of the existing signalised pedestrian crossing on South Road between Hollingside Lane and Elvet Hill Road.