Phase 10

Phase 10

Phase 10 works from Hollingside Lane to the Victor Watts Library started on the 29/06/20. Works in this phase involve:

  • A new footpath from the Hollingside Lane/South Road junction running along Hollingside Lane to the front of Victor Watts Library.
  • A new raised table section of road to the front of Victor Watts Library alongside a new combined kerb drainage system running the full length of Hollingside Lane.